Driveways & Patios
Floors & Foundations
Floors & Flatwork
Sites & Facilities
Floors & Coatings
Facilities We Serve
Manufacturing · ESD
Static-Dissipative ESD Flooring for Pittsburgh Plants
When sensitive electronics sit on your factory floor, static charge from workers, carts, and equipment can destroy components before they ship. A properly engineered ESD floor absorbs that charge and routes it safely to ground. Pittsburgh Concrete installs dissipative concrete systems with measured resistance ranges that meet ANSI/ESD specs, grounded to your building electrical, and verified after cure. Free written estimate on every project.
- Resistance range verified
- Grounded to building electrical
- Free written estimate, firm schedule
The ESD spec
Why Static Dissipation Requires Precision
A floor that conducts electricity too well creates electrical hazards. A floor that insulates too much lets static build up faster than it drains. The ESD sweet spot is dissipative: resistance in a narrow band that lets charge flow to ground at the right speed, protecting components without creating shock risk.
We start by confirming your facility's ANSI/ESD standard (electronics manufacturing, clean rooms, and pharmaceutical assembly each have their own specs). Then we install a matched epoxy system with conductive fillers loaded to hit that resistance window. After the concrete cures, we test across multiple points with a megohmmeter and hand you documented proof that the floor meets spec.
Our heavy-duty manufacturing floors and chemical-resistant epoxy systems often run alongside ESD zones in the same facility. We also serve EV battery clean rooms with the same precision approach.
Installation sequence
How We Build ESD Flooring in Pittsburgh
-
Spec the standard and grounding
We review your ANSI/ESD requirement, identify which zones need coverage, and work with your electrical team to plan the ground connection points and copper strip layout in the concrete.
-
Prepare slab and embed grounds
The concrete slab is ground to the system profile, copper ground strips are set at engineered spacing, and connections to the building electrical ground are installed per spec.
-
Apply ESD epoxy system
The dissipative epoxy (primer, body coat, topcoat) is applied with conductive carbon black and aggregate at the right loading to land in the target resistance range.
-
Test and document
After full cure, we megohmmeter-test the finished floor at multiple points, record the resistance readings, and provide you with a compliance report for audits and recertification.
The proof is in the test
Megohmmeter Verification Closes the Loop
An ESD floor that looks right but fails the resistance test is worse than useless. It creates a false sense of protection and can expose your facility to compliance violations. We never hand off an ESD project without megohmmeter readings across the finished floor, documented in a report you can show auditors.
The verification step also catches any installation issues before the zone goes live. If a reading falls outside spec, we identify the problem and correct it before you start production. Coordinate with your electrical contractor on the ground scheme, and with our team on phasing if you have dust-proof sealing or warehouse floor coating in adjacent zones.
Related manufacturing services
ESD Pairs With Other Manufacturing Floors
ESD is one of four specialized manufacturing systems we install. See the others.
Heavy-Duty Concrete Floors
High-strength systems for heavy equipment, impact, and abrasion in manufacturing zones.
Learn moreChemical-Resistant Flooring
Urethane and specialty epoxy rated for industrial chemical spills and exposure.
Learn moreDust-Proof Concrete Sealing
Densifier and sealer systems that lock down concrete dust for cleaner production areas.
Learn moreCommon questions
ESD Flooring Questions, Answered
Resistance ranges, grounding, verification and which manufacturing zones need ESD.
ESD floor installed and verified across our assembly zone. Resistance documentation supported our customer compliance audit. The system has held for two years of daily operation.
They knew the ANSI/ESD spec cold, coordinated with our electrical contractor on grounding, verified with the megohmmeter at handoff. No improvisation, no audit findings.
Stricter clean room ESD spec, they hit it. Documentation, grounding, verification all in order. The auditor specifically called out the install quality.
Phased ESD install during off-shifts so production never stopped. Each zone verified before reopening, no resistance drift between zones. Real coordination.
From the blog
Concrete Guides & Articles
Practical reading on planning, finishes and caring for concrete in Pittsburgh.
Ready to start
Get a Free ESD Floor Quote
Share your ANSI/ESD standard, the zones needing coverage, and your production schedule. We will spec the system, plan the grounding, and send a written quote with verification steps included.
We'll assess the facility and send a written quote within one business day.