Skip to main content
Pittsburgh & area concrete contractor · Free written estimates
(412) 801-7544

Food Processing · Food-Grade Epoxy

Pittsburgh Plants Need Food-Grade Epoxy Flooring Built for Inspection

Regulators check the slab, not just the product. Pittsburgh Concrete installs urethane cement and food-rated epoxy systems, with seamless cove base and full compliance documentation, so your floor passes USDA and CFIA inspection the first time. Free written estimate on every project.

  • USDA/CFIA compliant systems
  • Seamless with integrated cove
  • Free written estimate, firm schedule

Compliance-driven

Why Food-Grade Floors Are a Separate Category of Concrete Work

A production slab in a federally-inspected facility carries requirements that standard industrial epoxy simply was not designed to meet. The floor must be seamless from wall to wall, the coating must survive repeated hot caustic wash-down without delaminating, and the wall-floor junction needs an integrated cove base that leaves no crevice for bacteria to persist between cleaning cycles. Those three requirements together rule out most off-the-shelf coating systems.

Urethane cement addresses each point directly. It bonds to the concrete slab under wet or contaminated conditions, tolerates the thermal shock when 180-degree wash water hits a cold floor, and holds up against the lactic acids, fats, and caustic sanitizers common in meat, dairy, and bakery production. The cove base is formed from the same material, creating a monolithic surface that a mop or pressure wand can clean without leaving a seam. We install with Sika floor systems and similar food-rated products, and every project includes the material data sheets and as-built documentation your compliance officer needs on file. See our Sika floor systems page for product details, or review the broader USDA/CFIA compliant flooring scope. For facilities that also need non-food-zone protection, our chemical-resistant flooring covers adjacent areas with a distinct but compatible system. Questions about what a specific zone requires? The concrete FAQs cover common compliance scenarios.

Recent work
food-grade urethane cement floor in a Pittsburgh food processing facility
integrated cove base on food-grade flooring system

How it works

From Slab Assessment to Food-Grade Floor Handoff in Pittsburgh

  1. Map the zones and confirm the spec

    Before any prep begins, we walk the facility with the plant manager or food safety lead to map each production, processing, and packaging zone. We confirm which regulatory standard applies (USDA, CFIA, or a facility-specific protocol), document the wash-down chemistry in use, note the specific biological and chemical exposures by zone, and record the cove base height the compliance spec requires. That information drives every material and thickness decision.

  2. Prepare the concrete slab

    Each zone's concrete slab is diamond-ground to the surface profile the urethane cement system requires for a reliable bond. Existing coatings, grease contamination, and laitance are removed completely. Cracks and spalled areas are repaired with food-compatible patching materials that won't undermine the topcoat bond. The slab is inspected for moisture before the coating goes down, because moisture trapped under a sealed floor is a compliance problem waiting to happen.

  3. Pour and trowel the urethane cement

    Urethane cement is mixed and applied at the engineered thickness across the floor, then hand-troweled to a consistent finish. At every wall, the material is carried up to the specified cove base height and formed into a radius that eliminates the right-angle junction. The result is a single continuous surface, floor and cove together, with no seam in the cleaning path. Anti-slip aggregate is broadcast into the surface where the spec or facility safety plan calls for it.

  4. Topcoat, cure, and hand off the compliance file

    A food-rated topcoat seals the urethane cement and brings the surface to the final finish. The zone stays offline through the full cure window before food contact resumes. At handoff, we deliver the complete compliance package: material data sheets, product approvals, as-built cove base dimensions, and a maintenance protocol listing compatible cleaning and sanitizing chemicals. The file is ready for your next scheduled inspection.

What inspectors look for

Audit-Ready Documentation Delivered With Every Install

A food-grade floor that passes visual inspection but lacks supporting paperwork can still generate a finding. Federal inspectors reviewing a production facility want to see the material approval, the installation method, the cove base dimensions, and the cleaning protocol, all in one place. Pittsburgh Concrete assembles that file as part of every food-grade epoxy project, not as an afterthought. The plant manager receives a complete compliance package on the day the zone returns to production.

Phasing is built into the project plan from the quote stage. Each zone goes offline for prep, pour, and cure while the rest of the facility keeps running. We schedule around your planned sanitation windows where possible to minimize the gap between a zone's last production run and its first day back. For facilities with adjacent cold-storage areas, our freezer floor work uses a compatible but cold-rated system. Warehouse areas outside the food zone can be addressed with warehouse floor coating. The full food processing scope, including cove base and compliant flooring, is at food processing services. Cost and timeline questions are covered in our concrete cost guide.

Quote a food-grade floor
finished food-grade floor in a Pittsburgh production facility
Compliant USDA/CFIA
Documented For inspection
Free Written estimate

Common questions

Food-Grade Epoxy Questions, Answered

Compliance, wash-down chemistry, cove base and inspection documentation.

Urethane cement handles the thermal shock of hot wash-down better than standard epoxy and resists the organic acid and caustic combinations common in food production. For most federally-inspected food zones, urethane cement is the standard answer.
Spec varies by facility type and inspection jurisdiction; typically several inches up the wall. We confirm the required height with the compliance officer or food safety lead before installing.
Yes, by phasing around production zones. Each zone is offline during install and cure, with production routed around the work zone. The phasing plan is built into the project plan from quote stage.
Typically a week per zone including cure before food contact, with the specific timeline depending on zone size and complexity. We work with operations to time the install around scheduled cleaning days where possible.
Yes. Material specs, install method, cove base dimensions, and maintenance protocol are documented and delivered with the project. Your compliance file is ready for inspection from day one of operations.

Client reviews

What Pittsburgh Operations Say About Their Food-Grade Floors

★★★★★ 4.9 · 87 reviews on Google
Read all reviews →
★★★★★

Urethane cement install across our production zones, USDA inspection passed first time with the documentation we had ready. The compliance side mattered as much as the install quality.

Z. F5
Plant Manager, Pittsburgh Food Processor
★★★★★

Cove base at every wall transition, seamless surface across the production floor. Disinfection takes less time, swab tests came back cleaner than before. Worth the right spec.

Y. F5
QA Director, Aliquippa
★★★★★

Phased install across our cells, production continued in the rest of the facility throughout. Each cell back to food contact on the cure schedule. Real coordination.

Q. G5
Food Production Operations, Monroeville
★★★★★

They knew the CFIA spec cold, installed accordingly, documentation supports our annual inspection. The expertise was specific to food, not generic industrial.

X. F5
Bakery Director, Mckeesport

Ready to start

Schedule a Food-Grade Floor Assessment in Pittsburgh

Share the facility layout, the applicable compliance standard, and your production schedule. Pittsburgh Concrete will spec the urethane cement system, confirm the cove base detail, and deliver a written quote within one business day.

We'll assess the facility and send a written quote within one business day.