Driveways & Patios
Floors & Foundations
Floors & Flatwork
Sites & Facilities
Floors & Coatings
Facilities We Serve
Parking · Curb & Gutter
Machine-Formed Curb & Gutter for Pittsburgh Lots
The edge of a parking lot is where drainage begins. Curb and gutter form the boundary between pavement and landscape, channel stormwater to catch basins, and meet city specifications at street tie-ins. We pour both machine-slipformed long runs and hand-formed transitions, all engineered to slope and cross-section. Free written estimate on every project.
- Slipform paver for continuous runs
- Hand-formed details and transitions
- City spec tie-ins, slope verified
The gutter is the system
How Curb & Gutter Manages Lot Drainage
Curb and gutter are not decorative. The gutter pan is a channel that collects water from the lot surface and directs it toward catch basins; the curb is a barrier that prevents vehicles from leaving the pavement and keeps the water in the pan. Without proper slope, the gutter becomes a pond. Without the curb, water spreads across the landscape.
Long straight runs are poured with a slipform machine that moves at a steady pace, maintaining consistent cross-section and slope. Curves, intersections, drop-curb details, and transitions to adjacent pavement are hand-formed by our crew, then tied seamlessly into the machine-formed sections. The result is one continuous concrete edge that functions as designed.
This work connects to our broader parking lot concrete services, and often coordinates with site sidewalks and ADA-compliant ramps. When curb fails, we handle it through our parking repair program.
The sequence
Steps to Install Curb & Gutter in Pittsburgh
-
Survey and stake the line
The curb line is marked from the property survey and drainage plan. Elevations are set at every catch basin, transition, and slope change. The staking confirms the path water will follow.
-
Excavate and compact base
Subgrade is dug to depth, compacted, and gravel base is placed and compacted again. The surface is brought to the elevation where the concrete pour will start.
-
Machine-form or hand-form
Long runs use a slipform paver that extrudes the concrete to the engineered cross-section. Curves, intersections, and drop-curbs are hand-formed and tied into the slipform work.
-
Joint, cure, and finish
Control joints are cut at engineered spacing. The concrete cures protected from weather. Tie-ins to the parking slab and street are detailed and inspected.
Drainage is the detail
Why Slope Determines Gutter Success
A gutter without slope is a water trap. Every inch of the pan must angle toward the next catch basin at a grade steep enough to move water during peak rainfall, yet shallow enough to look intentional. If a slipform machine catches on a subgrade irregularity, it can lose slope by fractions of a percent, creating low spots that pond and freeze in winter.
We monitor slope during the pour, not just at the end. After cure, we verify that water actually flows to the basins. Coordinate the curb pour with the parking lot slab so the meeting is flush, with the city street so the tie-in passes inspection, and with any ADA ramps that need curb cuts. The curb is the junction between systems.
Related parking services
Other Parking Concrete Services
Curb & gutter is one component of a complete parking system. See the full range.
Parking Lot Slab
Full-depth parking lot pour, jointed and sloped for truck traffic and drainage.
Learn moreLot Repair
Patch, mill, or overlay failing sections without full replacement.
Learn moreMulti-Level Structure
Engineered parking structure concrete, protected from salt and live load.
Learn moreCommon questions
Curb & Gutter Questions, Answered
Slipform vs hand-formed, slope specs, city tie-ins and what curb actually does.
Long slipform run around our entire lot perimeter. Continuous, sharp edges, exact slope to the catch basins. The drainage works perfectly through every melt.
Hand-formed transitions at every entrance look like part of the design, not patched-in. They coordinated the curb pour with the asphalt apron so the meeting line is invisible.
City tie-in passed inspection first time. They knew the city's spec, poured to it, and the inspector signed off without revisions. Saved real schedule slip.
Drop-curbs at every accessible ramp tied in flush. ADA inspector confirmed compliance. The detail work shows; nothing improvised, everything to spec.
From the blog
Concrete Guides & Articles
Practical reading on planning, finishes and caring for concrete in Pittsburgh.
Ready to start
Get a Free Curb & Gutter Quote
Provide the run length, any city tie-in requirements, and the drainage path, and we will assess and quote in writing.
We'll assess the curb work and send a written quote within one business day.